Construction of time chart values of ​​chosen production rate




To construct the time diagrams of samples in the main application form of STATISTICA it’s necessary to choose the function “Graphs”. In the window of this function we choose “2D graphs”, and in it – kind of graphical construction – “ 2D Line Plots – Variables” – fig.1.6.

Fig. 1.6. Form while selecting the building time charts

Pressing left mouse button on the desired position on the screen will form the window parameter setting of the regime (fig.1.7).

Fig.1.7. Options of window "Quick" in the formation parameters of building time charts

After this:

§ In the option “Quick” we set:

- after pushing the button “Variables” – arrays of data names (recommended 2-3), which was assigned to them;

- in the window “Graph type” - “Multiple”

- in the window “Case names” (fig.1.8) – the “Off” regime “Off” (ie on the X axis will be postponed numbers of data samples - in our case - month weekdays).

Fig.1.8. The options window while the formation of parameters of building timing diagrams

After this press ОК. The screen will appear ordered by the timing diagrams (fig.1.9).

 

 

Fig.1.9. The result of timing diagrams construction


Поделиться:

Дата добавления: 2015-09-15; просмотров: 162; Мы поможем в написании вашей работы!; Нарушение авторских прав





lektsii.com - Лекции.Ком - 2014-2024 год. (0.006 сек.) Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав
Главная страница Случайная страница Контакты